Lecture No |
Unit |
Date of Publication |
Topic Name |
Video Lecture |
1
|
Unit-1
SYMBOLS AND CODES
|
21-07-2020 |
1.0). INTRODUCTION TO THE SUBJECT
1.1). CIRCUIT SYMBOL INTRODUCTION
|
|
2
|
Unit-1
SYMBOLS AND CODES
|
28.07.2020 |
1.2 ). SYMBOLS OF VARIOUS TYPES OF ELECTRICAL QUANTITIES AND DEVICES |
|
3
|
Unit-4
DOMESTIC AND COMMERCIAL WIRING FOR LV EQUIPMENT
|
05.08.2020 |
4.2 STAIR CASE WIRING,
4.2 DOUBLE STAIR CASE WIRING,
4.2 GODOWN WIRING,
|
|
4
|
Unit-4
DOMESTIC AND COMMERCIAL WIRING FOR LV EQUIPMENT
|
05.08.2020 |
4.5.1 3-POINT STARTER,
|
|
5 |
Unit-4
DOMESTIC AND COMMERCIAL WIRING FOR LV EQUIPMENT
|
05.08.2020 |
4.5.2 NECESSITY OF STARTER |
|
6 |
Unit-3
CONSTRUCTIONAL FEATURES OF ELECTRICAL MACHINES
|
18.08.2020 |
3.2 DC MACHINE CONSTRUCTION |
|
7
|
3. CONSTRUCTIONAL FEATURES OF ELECTRICAL MACHINES
|
26.08.2020 |
3.2 COMMUTATOR OF D.C.MACHINE |
|
8
|
3. CONSTRUCTIONAL FEATURES OF ELECTRICAL MACHINES
|
26.08.2020 |
3.2 COMMUTATOR OF D.C.MACHINE |
|
9
|
|
02.09.2020 |
INTRODUCTORY LECTURE |
|
10
|
3. CONSTRUCTIONAL FEATURES OF ELECTRICAL MACHINES
|
03.09.2020 |
3.1 PARTS OF TRANSFORMER UPTO 2 MVA |
|
11
|
3. CONSTRUCTIONAL FEATURES OF ELECTRICAL MACHINES
|
03.09.2020 |
3.1 PARTS OF TRANSFORMER UPTO 2 MVA |
|
12
|
2. ISTALLATION , MOUNTING AND LAYOUT OF POWER AND SAFETY EQUIPMENT
|
09.09.2020 |
2.4 SYSTEM EARTHING METHODS,SOLIDLY EARTHING, RESISTANCE EARTHING, REACTANCE EARTHING, PIPE AND PLATE EARTHING |
|
13
|
2. ISTALLATION , MOUNTING AND LAYOUT OF POWER AND SAFETY EQUIPMENT
|
10.09.2020 |
2.3 66 KV STEEL TOWER, 132 kV STEEL TOWER, HYDRO POWER PLANT,PIN TYPE INSULATED , POLE MOUNTED SUBSTATION |
|
7
|
|
|
|
|
7
|
|
|
|
|
7
|
|
|
|
|